RadarPublic

From tender spotted to bid prepared

See what your bid file can contain.

Understanding the obligations, writing from your evidence and pricing every line: this example shows the intended work, all the way to a complete file ready for your approval.

Support matched to your file and your budget

Step 1

Understand and decide

A sourced summary, requirements, documents and showstoppers: decide whether a bid is worth preparing.

Step 2

Prepare the technical proposal

Organisation, method, schedule, quality and environment, based on your company's resources and evidence.

Step 3

Price every line

Detailed price schedule and calculations based on the quantities in the file and your confirmed costs. You approve your prices.

Step 4

Assemble the file for approval

Technical proposal, compliance matrix, documented annexes and financial part, brought together for your review before signature and submission.

These levels are confirmed according to the tender, the documents available and our preparation capacity. The full chain of assisted drafting and delivery has yet to be demonstrated in a pilot. Your budget may limit our involvement to the analysis; it never removes a mandatory requirement.

You confirm your resources, references, prices and commitments. Your authorised representative approves, signs and submits. Our support covers preparing the bid, not carrying out the works on your behalf.

The technical proposal, point by point

Method and resources

Site survey, access checks, protection, compatible products, cleaning of glass surfaces and frames, self-inspection and handover. Staff, qualifications and equipment must be evidenced by the company; no fictitious resource is presented as available.

Schedule and continuity

Organisation by facility, occupancy constraints, prior notice, written approval and cover for absences. The proposed timetable depends on the resources actually available.

Quality and acceptance

Inspection grid by area, follow-up of snags, rework and job sheet. Expected results are linked to the clauses of the file, without inventing an imposed correction period.

Products and environment

Product data sheets, safety data sheets and evidence of labels or equivalence, dosage, packaging and consumption. An environmental claim needs proof, not just persuasive wording.

Requirement → source → answer or missing evidence, in the documents reviewed
RequirementSourceHow the example handles it
Mandatory site visitRC p. 6, art. 2.7Certificate missing in the example. No certificate is fabricated.
Application and capabilitiesRC p. 7–8Identity, insurance, references, resources and powers of attorney to be supplied by the real company.
Technical proposal and bid documentsRC p. 8–10AE, BPU, DQE, schedule, products, equipment, method and quality monitoring to be reconciled.
Technical, price, environmentRC p. 9–10Weighting 50%, 40%, 10%. No invented score or probability of winning.
Window cleaning and accessCCTP p. 13–15Inside and outside faces, frames, suitable equipment and safety to be confirmed by the professional.
Schedule and acceptanceCCTP p. 14–15Written notice at least 15 days in advance, written approval and countersigned job sheets.
Products and supporting evidenceCCTP p. 16–17Technical sheets, safety sheets and environmental characteristics documented. No label is assumed.
Unit prices and quantitiesBPU/DQE lot 3 p. 122 lines, 21 quantities of 2 and GS3 potentially 1. The DQE guarantees no order.

22 lines, one verifiable calculation

Descriptions, units and quantities come from the official BPU/DQE (French price schedule). The prices are entirely simulated: they do not come from a supplier quote and do not reflect market rates. The table for the buyer is kept separate from the company's internal calculations.

€120,000 excl. VAT

Ceiling for the lot over its entire term. Not a spending commitment.

€19,153.92 excl. VAT, fictitious

Simulated comparative DQE basket, not guaranteed annual revenue.

RadarPublic fees are separate

Scope, capacity and quote remain to be confirmed. This example sets no support fee.

Teaching simulation — flat rate per visit and per site; amounts in euros excl. VAT
LineSiteDQE qtyFictitious unit priceFictitious total
L3-01Gymnase David Douillet2660.001,320.00
L3-02Tennis2240.63481.26
L3-03Piscine municipale2825.001,650.00
L3-04Futur gymnase2660.001,320.00
L3-05École élémentaire Francis et Odette Teisseyre2653.131,306.26
L3-06École maternelle Francis et Odette Teisseyre2488.13976.26
L3-07Restaurant scolaire Francis et Odette Teisseyre2323.13646.26
L3-08Accueil de loisirs Papillons des champs2323.13646.26
L3-09École élémentaire Jean-Louis Étienne2653.131,306.26
L3-10École maternelle Jean-Louis Étienne2488.13976.26
L3-11Restaurant scolaire Jean-Louis Étienne2323.13646.26
L3-12Accueil de loisirs Coccinelles des bois2323.13646.26
L3-13Groupe scolaire 31907.50907.50
L3-14Services techniques2323.13646.26
L3-15Hôtel de ville2405.63811.26
L3-16Espace jeunesse2240.63481.26
L3-17Police municipale2240.63481.26
L3-18Salle polyvalente2323.13646.26
L3-19Salle de la Ferme2323.13646.26
L3-20Salle des Écuries2323.13646.26
L3-21Salle de spectacles de l’Atmosphère et loges2660.001,320.00
L3-22Salle associative du couvent2323.13646.26
Total of the fictitious basket19,153.92

GS3: a single potential visit over the entire term, even though the DQE column is labelled annual. No annualisation and no multiplication by renewals. VAT and VAT-inclusive amounts are not calculated until the actual VAT regime is established.

Download the 22 lines with fictitious prices as CSV (in French)

The analysis must also reveal the showstoppers

  • Mandatory site visit and deadline missed: writing a technical proposal does not make the application admissible.
  • Different signature instructions on different pages of the RC: flag the discrepancy, without silently accepting or interpreting the clauses.
  • GS3 quantity and a generic annual flat-rate heading in the AE: clarify how they are treated before any real commitment.
  • Missing references, insurance, products, powers of attorney and administrative documents: no evidence is fabricated.

Example prepared from the municipal documents consulted on 1 November 2026. Not all amendments and answers on the buyer profile were cross-checked. It is not an exhaustive legal or technical validation.

Read the official documents on the municipality's website (in French)

The right tender for the right company

We match the subject, the territory, the requirements and the size of the lot against the company's activities and evidence. An unmet mandatory condition means not bidding; missing information remains to be confirmed. A score is no substitute for insurance or a reference.

The intended automated preparation tracks the documents and their versions, the requirements cited, the evidence supplied, the sections of the technical proposal and the calculations. The example does not yet prove complete extraction or autonomous delivery in production.

Do you have a tender and a current need?

Send us the link to the tender, your activity, the deadline and the help you need. Your support budget is optional. Please avoid confidential documents in this first exchange. The analysis may conclude that bidding is not worthwhile, or limit our involvement to studying the file.

Present my request to RadarPublic

Order the bid file at least 7 working days before the deadline. Not sure yet? Start with the Go / No-go review: within 2 working days you know whether bidding is worth it.

Your email program prepares the request; you decide whether to send it. It is not a purchase or a newsletter subscription.